水力发电站 3D模型
0
规格
- 几何polygonal
- 多边形74,175
- 顶点55,096
- 纹理Yes
- 索具化No
- 动画No
- 适合3D打印No
- 适合游戏(低多边形)No
- UV映射Yes
- 未封装UVoverlapping
描述
Krasnoyarsk hydroelectric power station.
A gravitational concrete dam with a length of 1065 m and a height of 124 m, consists of a left bank dam with a length of 187.5 m, a spillway - 225 m, a blind channel - 60 m, a station dam - 360 m and a right bank deaf - 232.5 m.
Installations for receiving and distributing electricity - 220 kV and 500 kV.
The capacity of the HPP is 6000 MW.
low-poly model with all major structural details, textures in the main by planar mapping.
Jul 30, 2020
添加日期
Aug 31, 2021
最后更新
评测
此产品当前没有评测。
为什么不做第一个评测者呢?












