-->
建筑车辆人物飞行器家具电子产品动物植物武器体育食品解剖学
已加入书签
书签已删除

ISS模块-ESP 3 3D模型

0
ISS模块-ESP 3 royalty-free 3d model - Preview no. 1
ISS模块-ESP 3 royalty-free 3d model - Preview no. 2
ISS模块-ESP 3 royalty-free 3d model - Preview no. 3
ISS模块-ESP 3 royalty-free 3d model - Preview no. 4
ISS模块-ESP 3 royalty-free 3d model - Preview no. 5
ISS模块-ESP 3 royalty-free 3d model - Preview no. 6
ISS模块-ESP 3 royalty-free 3d model - Preview no. 7
ISS模块-ESP 3 royalty-free 3d model - Preview no. 8
ISS模块-ESP 3 royalty-free 3d model - Preview no. 9
ISS模块-ESP 3 royalty-free 3d model - Preview no. 1
ISS模块-ESP 3 royalty-free 3d model - Preview no. 2
ISS模块-ESP 3 royalty-free 3d model - Preview no. 3
ISS模块-ESP 3 royalty-free 3d model - Preview no. 4
ISS模块-ESP 3 royalty-free 3d model - Preview no. 5
ISS模块-ESP 3 royalty-free 3d model - Preview no. 6
ISS模块-ESP 3 royalty-free 3d model - Preview no. 7
ISS模块-ESP 3 royalty-free 3d model - Preview no. 8
ISS模块-ESP 3 royalty-free 3d model - Preview no. 9
免版税许可仅限编辑
退还简单
最优惠价格保证
开箱即用
0 访问量
edobric

规格

  • 几何polygonal
  • 多边形377,349
  • 顶点376,928
  • 纹理Yes
  • 索具化Yes
  • 动画No
  • 适合3D打印No
  • 适合游戏(低多边形)No
  • UV映射Yes
  • 未封装UVnone

格式和文件

Cinema 4D
(.c4d)
27 MB

advanced
esp3.c4d

描述

Professional 3d model of ISS (International Space Station) module External stowage platform 3 (ESP 3). Very high level of detail. This 3d model was made with care and detail in every particular, based on real-world object. Good overall detail with smooth mesh. Models renders clean instantly. Quality model. C4D used for images. ESP-3 was installed on the P3 Truss at UCCAS-1 on August 14, 2007 during the Space Shuttle STS-118 mission. It has seven attachment sites for ISS spare parts and assemblies, called Orbital Replacement Units (ORUs). The platform also has handrails and attachment points for tethers and foot restraints that astronauts can use while working with the ORUs on the ESP-3. ESP-3 was the first major station element to be installed completely by robotics, using only the shuttle and stations robotic arms, an external berthing camera system (BCS) and a Photovoltaic Radiator Grapple Fixture (PVRGF). On January 12, 2010, the station's robotic arm was used again to move ESP-3 from the P3 truss segment UCCAS-1 site. It was grappled by the arm and then transferred down the station's backbone on the mobile transporter. ESP-3 was then attached to its new location on the lower part of S3 truss segment at the PAS-3 site. Moving the storage platform cleared the way for ExPRESS Logistics Carrier-3 to be installed during STS-134. The ORUs installed on ESP-3 are: FRAM-1 (top side) Pitch/roll joint (P/RJ) launched on ESP-3; FRAM-2 (top side) Flex Hose Rotary Coupler (FHRC SN1004) added by STS-126 crew; FRAM-3 (top side) empty (future home of failed PM SN0004 currently stored on the MBS POA, by the Expedition 38 crew Dec. 2013.; FRAM-4 (top side) Linear Drive Unit (LDU) added by STS-127 crew; FRAM-5 (keel side) Space-to-Ground Antenna (SGANT) added by STS-127 crew; FRAM-6 (keel side) Battery Charge/Discharge Unit (BCDU) launched on ESP-3; FRAM-7 (keel side) ATA Flight Support Equipment (FSE) added by STS-118 crew.
Dec 01, 2019 添加日期
Mar 08, 2022 最后更新

评测

此产品当前没有评测。
为什么不做第一个评测者呢?